A HAUSE specialist propertyHAUSE.ca

Electrical capacity, explained

Does your home actually need 200 amps?

EV charger. Heat pump. Air conditioning. Hot tub. Secondary suite. Check your home's capacity before deciding what needs to change.

Free homeowner pre-check · No obligation · No unsafe DIY

Capacity decision pathPre-check
100A service
Existing homeNew project
01Existing serviceMay be sufficient
02Load managementMay be appropriate
03Service upgradeMay add capacity

The breaker number is only the starting point. Existing demand and planned equipment determine what should be assessed.

Start with what you know

What service does your home have?

Choose the number shown on the largest main breaker that is already visible. Never remove a panel cover or touch electrical equipment.

Current electrical service size

A better starting point

200 amps isn't always the answer.

Your existing service may already have appropriate capacity. A panel change, an approved energy-management option, or a full service upgrade are different paths—and professional assessment determines which applies.

Know the system

Capacity is a path, not a panel door.

A service upgrade can extend from the utility connection to the equipment distributing power through the home.

01Utility
02Service
03Meter
04Main
05Panel
06Home
Explore every component

Three possible paths

The honest answer may be retain, manage or upgrade.

Professional assessment determines which path fits the home, equipment and jurisdiction.

01

Existing service

The current service may already have appropriate capacity after the applicable calculation.

02

Load management

An approved system may control suitable loads within the capacity already available.

03

Service upgrade

Additional permanent capacity may fit the project and longer-term electrification plan.

100A vs 200A

More capacity is not the same as a better decision.

The useful comparison is not just 100 versus 200. It is today's demand, tomorrow's equipment, the panel configuration and the full service path.

Compare service sizes
100A
Common in existing homesPotentially adequate depending on demand and planned equipment.
200A
Greater total service capacityOften considered for significant electrification; may involve utility-side work.
Evidence
Load calculation + site assessmentThe service number alone does not make the project decision.

Calgary electrical activity

Public evidence, with the limits left visible.

Open Calgary publishes daily electrical permit inspection data. We count permits separately from inspection events and do not claim it identifies every 200A upgrade.

See data and methodology
202535,648distinct electrical permit numbers with a 2025 issued date
Service inspection type4,410inspection events tied to permits issued in 2025—not upgrade projects
SourceDailyOpen Calgary dataset vxgy-id5s · verified Aug. 31, 2026

Operated under the HAUSE standard

Understand first. Then handle the actual project.

HAUSE is the accountable operating layer behind professional requests where local coverage is available.

  1. 01Request
  2. 02Review
  3. 03Match
  4. 04Assess
  5. 05Quote
  6. 06Complete
  7. 07Document
Vetted local operatorsLicensing + insurance verificationPermit + inspection coordinationWritten scopesProject documentation

Straight answers

Common capacity questions.

Do I need 200 amp service?+

Not automatically. Existing demand, planned loads, panel configuration, service equipment and management options determine what should be assessed.

Is 100 amp service enough for an EV charger?+

It can be. Charger output, existing demand and approved charging controls or energy management can change the answer.

Does replacing the panel increase amperage?+

Not by itself. A panel replacement and a service-capacity increase are different scopes.

Can load management avoid a service upgrade?+

Sometimes, for suitable loads, equipment and jurisdictions. It is not a universal alternative.

Do I need a permit?+

Electrical alterations commonly require the applicable permit, but the authority and exact process vary by location and scope.

More power starts with knowing what you need

Check the home before you choose the upgrade.

Start the Capacity Check Request HAUSE review