A 200 amp panel is only part of the power story.

Do you need 200 amp service? Maybe. A new panel, more utility capacity and load management solve different problems. See the whole service path before you pay for the wrong one.

No automatic upgrade verdict · No account required · Calgary permit and utility context

Conceptual house model / 001Explore the full path
Conceptual 3D cutaway house showing a meter, closed electrical panel and lit service paths
See beyond the panel.Utility supply · meter · panel · circuits

Conceptual illustration, not a wiring diagram. The actual installation needs professional verification.

Start with what you know

What service does your home have?

Choose the number shown on the largest main breaker that is already visible. Never remove a panel cover or touch electrical equipment.

Current electrical service size

Explore the service path

The panel is one stop in a longer journey.

Follow the connection from utility supply to a room in the house. Select each stage to see what must be verified before a service change is scoped.

Conceptual 3D cutaway house showing a meter, closed electrical panel and lit paths into rooms
Conceptual 3D illustration. It is not a wiring diagram or a representation of any property's installation.

Stage 01 / 04

Utility supply

Drop or lateral, transformer and metering supply.

Who to ask
Typically the serving utility
Understand this component

Equipment arrangements and ownership boundaries differ by property and utility. Have a qualified contractor and the serving utility confirm the actual path.

Quote scope checklist

Compare quotes line by line.

Two quotes for “a 200 amp upgrade” can cover very different work. Ask each contractor to state every item as included, excluded or not required.

What drives upgrade cost
  1. 01Utility

    Is utility work included, excluded or to be arranged by the owner? Who submits the utility request?

  2. 02Meter

    Is the meter base reused, relocated or replaced?

  3. 03Service conductors / feeder

    Are service conductors or feeders replaced, and over what route?

  4. 04Panel

    Is the panel replaced, and is it a like-for-like or a service-capacity change?

  5. 05Circuits

    Which new circuits are included, for which equipment?

  6. 06Permits + inspections

    Who applies for permits and books inspections? Are fees included?

  7. 07Restoration

    Is drywall, stucco, trenching or landscaping repair included or excluded?

  8. 08Closeout

    What documents are handed over (permit closeout, load calculation, panel directory)?

Three possible paths

The honest answer may be retain, manage or upgrade.

Professional assessment determines which path fits the home, equipment and jurisdiction.

01

Existing service

The current service may already have appropriate capacity after the applicable calculation.

02

Load management

An approved system may control suitable loads within the capacity already available.

03

Service upgrade

Additional permanent capacity may fit the project and longer-term electrification plan.

100A · 200A · 400A

Nominal rating is evidence, not a recommendation.

A service rating tells you one fact about the home. It does not say what the home needs. Compare what each number does — and does not — establish.

RatingWhere you see itWhat it does not proveQuestion to ask
100ARead guide →Common in many existing homes.Whether it can take a new load depends on the load calculation, not the number alone.What does the calculation show with the planned equipment? Is load management an approved option?
200ARead guide →Frequently discussed for homes adding several electric loads.A larger nominal rating is not automatically needed and does not describe equipment condition.Which components change (conductors, meter base, disconnect, panel), and what is the utility's scope?
400ARead guide →Less common in houses; usually a specialist design question.Utility supply, equipment and configuration need site-specific review.What is driving the request, and has the serving utility confirmed feasibility?

No row is a recommendation. The applicable load calculation and site assessment decide the scope. 100 vs 200 amp guide

Calgary electrical activity

Public evidence, with the limits left visible.

Open Calgary publishes daily electrical permit inspection data. We count permits separately from inspection events and do not claim it identifies every 200A upgrade.

See data and methodology
202535,648distinct electrical permit numbers with a 2025 issued date
Service inspection type4,410inspection events tied to permits issued in 2025—not upgrade projects
SourceDailyOpen Calgary dataset vxgy-id5s · verified Aug. 31, 2026

The project record

A new panel should come with a clear paper trail.

Ask the contractor to show how the decision was made, which parts are changing and how the completed work will be documented.

  1. 01Observe
  2. 02Calculate
  3. 03Scope
  4. 04Permit
  5. 05Coordinate
  6. 06Install
  7. 07Document
Contractor credentialsLoad calculationWritten component scopePermit + utility pathInspection closeout

Straight answers

Common capacity questions.

Do I need 200 amp service?+

Not automatically. Existing demand, planned loads, panel configuration, service equipment and management options determine what should be assessed.

Is 100 amp service enough for an EV charger?+

It can be. Charger output, existing demand and approved charging controls or energy management can change the answer.

Does replacing the panel increase amperage?+

Not by itself. A panel replacement and a service-capacity increase are different scopes.

Can load management avoid a service upgrade?+

Sometimes, for suitable loads, equipment and jurisdictions. It is not a universal alternative.

Do I need a permit?+

Electrical alterations commonly require the applicable permit, but the authority and exact process vary by location and scope.

More power starts with knowing what you need

Check the home before you choose the upgrade.

Start the Capacity Check →Email HAUSE for an assessment ↗